            This phase of work is the heart of the project. It includes the removal and replacement of the pressure tubes, calandria tubes, as well as the lower and upper feeders.

            This work is primarily completed by Shoreline Power Group.

            460 feeder tubes, 480 fuel channels, and 480 calandria tubes are removed and replaced.